So you've decided to build a home or cottage. Where to start?


So you've decided to build a home or cottage. Where to start?

determine the budget (the most economical building blocks for houses costing at least 2.0 - 3.0 million rubles.) These costs most families can not afford. Therefore, some way out through the sale of an apartment, with a budget of other comparable stretch construction for several years, and others are building a house, "the whole world", the fourth charge mortgage;

to determine the place for development, preferably in a field where to connect to electricity, gas, water, and if you're lucky sewer calculated not kilometers. In this case, given that building land must be owned that had a cadastral map with location. Check that it is the land, not what you buy another, otherwise you can build a house someone else's uncle, that he would be happy.
The value of land in the 10 - 20 acres on the outskirts of Ryazan in the range of 400 000 rubles. up to one million rubles. When choosing a location is not desirable proximity to landfills, wastewater treatment plants, eliminate flooded places, not the desired close proximity to cemeteries, etc. When choosing a site must be provided with access routes for the delivery of construction materials. Otherwise, throughout the building, you will have problems. Drivers are just not going to take you to impassable roads, building materials, either to turn back or unload construction materials there which will pass;

clarify not only the availability of the selected area of ​​land near the above communications, but also the ability to connect to them, preferably in writing. Unfortunately, the existing power supply and other utilities currently overloaded, and the officer, saying that, you just refuse to connect or offer to build for your new account with the installation of a power line transformer (so seven-million);

select the type of project (all the text links will open in a new tab) and modify it to your liking. Or order a project cottage home in the company. When you select a project once it is necessary to determine the need for a ground floor and according to the type of foundation. House with a ground floor has more features, but with this more costly. Necessary to determine the presence and location of the garage, the location and number of entrances to the house, floors, staircases, location communications material for the walls and roof form. Note: foam, gas silicate or lightweight expanded clay concrete block "TermoComfort" does not have much difference in the load on the foundation;

select builders.
Tip: do not hurry with the choice, be sure to check the result of the former, and it is desirable to hear reviews about them;

examine the issues of construction in advance to at least talk with the builders to understand all languages, and of course, without proper training, you simply will not know what was required of them and what and how to pay the money.